Our Ongoing Projects

Year Name Of Projects Client Approximate Project Area
2024
4-Lanning of Shahpur Bypass to Muktainagar section of NH-753L from design ch.- 186.000 to design ch.- 216.278 in the state of Madhya Pradesh on Hybrid Annuity Mode.
Muktainagar – Shahpur Corridor Pvt. Ltd. (B.N. Constructions)
70,000 SQM
2024
Construction of 4-Lane access controlled Greenfield Highway section of NH-163G (Khammam- Vijayawada) from- V.Venkatayapalem village at Design ch.- 220+480 km. to Brahmanapalli(K) village at Design ch.- 250+400 km. (Total Length – 29.920 km) under other Economic Corridor (NH(O) Programme on Hybrid Annuity Mode in the state of Telangana (Package-I).
Dinesh Chandra R. Agrawal Infracon Pvt. Ltd.
100,000 SQM
2024
Four laning of NH-119 from Behsuma at Km 39.250 (Ex. Km 39+240) To Bijnor at Km 78.810 (Ex. Km 86+590) (Design Length= 39.560 Km) in the state of Uttar Pradesh on Hybrid Annuity Mode.
KRC Infra Projects Pvt. Ltd.
80,000 SQM
2024
Construction of Four Lane access controlled Greenfield National Highway (NH-119D), starting from its Junction with NH-19 (Old NH-02) near village Amas connecting Ramnagar, Kachhi Dargah, Kalyanpur (Hajipur), Tajpur and terminating at its Junction with NH-27 near village Bela Nawada (Darbhanga) under Bharatmala Pariyojna in the state of Bihar- Package- II from village Shivrampur (Design Ch.55+002) to village Ramnagar at its Junction with SH-78 (Proposed Patna Ring Road) (Design Ch.109+324) Total Length – 54.322 Km
MEIL Ramnagar Four Lane Roadways Pvt. Ltd. OR Megha Engineering & Infrastructures Ltd.
1,25,000 SQM
2024
Construction of Shohratgarh Bypass (Design Length – 6.273 Km) to Two Lane with Paved Shoulder on NH-730 (Starts near Ch.- 413+700 and Ends near Ch.- 419+000) under Engineering, Procurement & Construction (EPC) Mode in the state of Uttar Pradesh
Bhardwaj Unibuild Pvt. Ltd.
30,000 SQM
2024
Construction of Shohratgarh Bypass (Design Length – 6.273 Km) to Two Lane with Paved Shoulder on NH-730 (Starts near Ch.- 413+700 and Ends near Ch.- 419+000) under Engineering, Procurement & Construction (EPC) Mode in the state of Uttar Pradesh
Bhardwaj Unibuild Pvt. Ltd.
30,000 SQM
2024
Construction of 6-Lane Chittoor – Thatchur (Greenfield Alignment) from Km.- 0.000 to Km.- 43.800 on Hybrid Annuity Mode under Bharatmala Pariyojana in the state of Andhra Pradesh and Tamil Nadu (Package-I).
KCC Chittoor Highways Pvt. Ltd.
25,000 SQM
2024
Four Laning of Munger to Mirzachauki (NH-80) section from Rasalpur to Mirzachauki design chainage Km. 157+350 to Km. 193+931 (PKG-IV) on Hybrid Annuity Mode in the state of Bihar.
APCO Vikramshila Expressway Pvt. Ltd
30,000 SQM
2024
Six Laning of Varansi- Aurangabad section of NH-2 from km.- 786+000 to km. 871+000 (Length – 85km.) in the state of Uttar Pradesh & Bihar under NHDP Phase V on DBFOT (Toll) Basis.
SGSR Pvt. Ltd.
10,000 SQM
2024
Khed – Sinnar VUP (NH-60) Design and construction of vehicular underpass with approaches at Khodad junction (km.78.600) and Ambikhalsa junction (km.113.150) on Khed Sinnar section of NH-60 (old NH-50) in the state of Maharashtra as standalone project on EPC mode.
New India Structure Pvt. Ltd. / NVR
5,000 SQM
2023
Construction of 4-Lane Greenfield Delhi-Amritsar-Katra Expressway from Jussur Kheri in KMP Expressway to Junction Rohtak-Panipat Road (NH-709) near Rukhi Pani village (Km.- 0+000 to 34+000) on Hybrid Annuity Mode under Bharatmaa Pariyojana in the state of Haryana (Phase I – Package – I).
KCC DAK Package-I Expressway Pvt. Ltd.
40,000 SQM
2023
Construction of 4-Lane Banglore Chennai Expressway from km.- 180.000 to km.- 204.500 (Walajahpet to Arakkonam section in the state of Tamilnadu) under Bharatmala on Hybrid Annuity Mode (Phase III – Package II).
KCC WALAJAHPET Expressway Pvt. Ltd.
20,000 SQM
2023
Connectivity to Jewar International Airport Construction of 6-Lane Greenfield Connectivity to Jewar International Airport from DND – Faridabad – Ballabhgarh Bypass KMP Link – SPUR to Delhi Mumbai Expressway on Hybrid Annuity mode in the state of Haryana and Uttar Pradesh under Bharatmala Pariyojana.
APCO Jewar Expressway (P) Ltd
1,00,000 SQM
2023
Construction of 4-Lane Greenfield Jalbehra – Shahbad section of NH-152G start from Km. 0+000 to Km. 22+850 (Part of Shahbad – Thol Feeder Route) in the state of Haryana on Hybrid Annuity Mode under Bharatmala Pariyojana Phase-I.
Ceigall India Ltd.
1,25,000 SQM
2023
Construction of 4-Lane Greenfield Jalbehra – Shahbad section of NH-152G start from Km. 0+000 to Km. 22+850 (Part of Shahbad – Thol Feeder Route) in the state of Haryana on Hybrid Annuity Mode under Bharatmala Pariyojana Phase-I.
Ceigall India Ltd.
1,25,000 SQM
2022
Widening and Strengthening for Improvement and Up- gradation of NH-709A Garhmukteshwar (Chainage – 83+200 of NH-24) to Meerut (Chainage- 9+860 of NH- 235) including connector to NH-119 Package-XII in the state of Uttar Pradesh.
Tata Projects Ltd.
60,000 SQM
2022
Detailed Engineering Design for Construction of 4/ 6-Lane Access- Controlled Expressway (Package- XIV) from junction near Balsua with NH-54 to junction with Hiranagar road near village – Gurha Baildaran (Km. 423+500 to Km. 468+100) of Delhi – Amritsar – Katra Expressway in the state of Punjab and UT of J&K.
Megha Engineering & Infrastructures Ltd.
2,50,000 SQM
2022
4-Laning of Indore to Raghavgarh section of NH-59 (Indore – Harda, Package-1 Stretch) from MR-10 junction on NH-3 Bypass Ch. – 0.250 to Raghavgarh Ch.- 26.903 (Design 26.653 Km) under Bharatmal Pariyojana Phase-I (EC) in Madhya Pradesh on EPC Mode.
P. D. Agarwal Infrastructure Ltd.
80,000 SQM

Our Complete Projects

Year Name Of Projects Client Approximate Project Area
2023
Development of Six – Lane Access-Controlled Highway of DaatKali Tunnel – Dehradun of Ganeshpur – Dehradun Section of NH-72A from Km.- 16+380 to Km.- 19+785 (Design Chainage) in the state of Uttarakhand under Bharatmala Pariyojana on EPC Mode (Package-3).
KRC Infra Projects Pvt. Ltd.
18,000 SQM
2023
Development of 4/6 Lane Access Control Expressway from Design Chainage Km.- 515.000 to Km. 528.300 (Kunjwani to Sidhra Section of NH-44) and from Design Chainage Km. 550.900 to Km. 566.520 (Domel to Katra Section) on Hubrid Annuity Mode under Bharatmala Pariyojna in the UT of J&K (Phase II – Package XVII).
APCO Maa Vaishno Expressway Pvt. Ltd.
50,000 SQM
2023
Six Laning of Varansi – Aurangabad section of NH-2 from Km. 786+000 to Km. 978+400 (Length – 192.400 Km) in the states of Uttar Pradesh & Bihar under NHDP Phase – V as BOT (Toll) on DBFO Pattern.
Welspun Enterprise Ltd. / Ayush Procon Pvt. Ltd.
10,000 SQM
2023
Construction of Eight-Lane acces controlled Expressway from Km. 3.000 to Km. 20.200 (Shirsad to Akloli section – SPUR of Vadodara Mumbai Expressway) in the state of Maharashtra on Hybrid Annuity Mode under Bharatmala Pariyojana.
APCO Infratech Pvt. Ltd. / IRCON International Ltd
12,000 SQM
2022
Rectification of 01 No. black spot identified by Ministry of Road Transport & Highways (MORT&H) under jurisdiction of PIU-Chittorgarh at Km. 05+900 (JK Circle) on Rajasmand – Bhilwara section of NH-758 from Km. 0.000 to Km. 87.250 in the state of Rajasthan
K. K. Gupta Constructions Pvt. Ltd.
12,000 SQM
2022
Construction of Four Lane Flyover with service road at the junction of NH-58E with NH-48 under annual plan 2021- 22 of road safety in the state of Rajasthan on EPC Mode for permanent rectification of black spot ID no. RJ-02/282
K. K. Gupta Constructions Pvt. Ltd.
12,000 SQM
2022
Construction of Reinforced Earth wall for Construction of 4-Lane Greenfield Delhi-Amritsar-Katra Expressway from junction with Jind-Panipat Road (NH-352A) near Gangana village to junction with Jind-Karnal Road (NH- 709A) near Alewa village (Km. 60+800 to Km. 91+400) on Hybrid Annuity Mode under Bharatmala Pariyojana in the state of Haryana – Package – III.
KCC KATRA Expressway Pvt. Ltd
1,00,000 SQM
2022
Construction of 8-Lane Expressway starting before KMP Expressway and ends at CH.- 47+000 near Khanpur Ghat (Km.- 18+500 to Km. 47+000) section of Delhi – Vadodara Green Field Alignment (NH-148N) on EPC mode under Bharatmala Pariyojana in the state of Haryana
APCO Infratech Pvt. Ltd.
40,000 SQM
2021
Four laning work of Package-2 from km. 220.000 (near Kurankhand) to km. 270.000 (near Shelad) section of Amravati – Chikhli NH-6 in the state of Maharashtra to be executed as Hybrid Annuity Project under NHDP Phase – IV.
Rajpath Infracon NH-6 PKG-2 Pvt. Ltd.
25,000 SQM
2021
Four-Laning of Ausa – Chakur of NH-361 from km. 55.835 to km. 114.600 (Existing chainage: km. 470.000 to km 528.200) under NH (O) on Hybrid Annuity Mode in the state of Maharashtra.
Gangamai Industries and Construction Ltd.
45,000 SQM
2021
Four-Laning of Katni Bypass section of National Highway- 30 (Old NH-7) from km. 359+375 to km. 378+555 having a length of 19.230 km in the state of Madhya Pradesh on EPC Mode
Shreeji Infrastructure India Pvt. Ltd.PRL Projects & Infrastructures Pvt. Ltd.
25,000 SQM
2021
Remodeling of existing pucca ramps along right marginal embankment (RME) from R.D. 0m TO R.D. 10500m on city side to maintain accessibility from various villages to RME.
Irrigation & Flood Control Department (Delhi)
18,000 SQM
2021
Balance Four-Laning work of Package-4 from km. 315.000 (near Nandura) to km. 360.000 (near Chikhali) section of Amravati – Chikhali NH-6 in the state of Maharashtra to be executed as Hybrid Annuity Project under NHDP Phase- IV.
Kalyan Toll Infrastructure Ltd.
35,000 SQM
2021
Proposed Underpass/ Flyover at FNG, near Bahlolpur village, Noida, Uttar Pradesh.
New Okhla Industrial Development Authority
6,000 SQM
CONTACT US

Do You Have A Question?

Our goal is not merely to be one of the most successful companies in the sector, but to be the most preferred partner-of-choice.

Address

(Unit No.- 521-522, Tower-B, 5th Floor, Bhutani Alphathum, Sector-90, Noida – 201305, Uttar Pradesh

Mail

crystalconstructioncompany@gmail.com

Phone

09582215262

GET IN TOUCH !!!

We have a well defined, strategically focused portfolio and high visibility of cash flows from our ongoing
projects. We also have a successful track record of optimizing cash flows.

Scroll to Top